Designing MRT Viaduct

| SMEC, KTP and Surbana Jurong Group
Tento článek je dostupný také v dalších jazycích:
The MRT viaduct is a unique structure in Singapore which integrates an MRT station with a bus interchange and adjoining commercial developments such as shopping malls. In this project, the MRT viaduct is integrated with the building structure on levels B2, B1, and L1 and features a landscaped roof that fits seamlessly within the viaduct. The design adheres to the latest Eurocode standards, with the inclusion of Singapore's national annex and references to PD6687-1 and PD6687-2. Using IDEA StatiCa, Ei Sheng Hong, the Bridge Design Lead at SMEC (part of the Surbana Jurong Group), along with his team, designed the superstructure, overcoming numerous challenges along the way.

About the project

This viaduct utilizes the innovative Floating Slab Track (FST) technology. It incorporates a double-pier system with full structural discontinuity to enhance noise and vibration control.

The superstructure includes two distinct types of LTA standard post-tensioned box girders, supported by unsymmetrical and unevenly loaded crossheads which are monolithically incorporated with the viaduct. Access openings are strategically located within these crossheads. The roof columns, designed to withstand derailment loads, uphold the UIC777-2R standards.

An extensive track-structure interaction analysis was conducted adhering to UIC774-3R guidelines, taking the use of FST into account. The design of the viaduct is intricately intertwined with its construction sequence, the roof structure above, and the building structure below. The viaduct's substructure is seamlessly connected to the building structure, with the pile cap forming an integral part of the B2 basement slab and the diaphragm wall of the West Wing structure.

IDEA StatiCa Concrete používáme téměř ve všech našich projektech k řešení složitých, ale i jednoduchých problémů, protože IDEA StatiCa nám to umožňuje. Oceňujeme efektivní statické výpočty, které umožňuje provádět.
Ei Sheng Hong
Ei Sheng Hong
Vedoucí návrhu mostů – SMEC, KTP and Surbana Jurong Group
Malaysia

Engineering challenges

One project challenge was designing the concrete crossheads, which included a shared crosshead between two single box girders carrying rails for different directions. The crosshead's two openings altered the typical behavior, necessitating the design of asymmetrical structures that would have been difficult to calculate manually.

The viaduct's design includes a landscape roof with columns supported on the viaduct crosshead, which is supported centrally and laterally. Additionally, it's unevenly loaded with heavy weight on one side and none on the other.

Solutions and results 

Ei Sheng Hong's team successfully incorporated actual rebars into IDEA StatiCa Detail, generating valuable reports on their use. The software's automatic topology optimization calculated the strut-and-tie path, eliminating the need for time-consuming trial and error. 

The calculation process, including verification, took just a day, a significant reduction from the months it would take manually. This efficiency facilitated the swift completion of the design and production of reinforcement drawings.

IDEA StatiCa nám poskytuje uživatelsky přívětivé nástroje, které dokáží řešit složité problémy prostřednictvím důkladné analýzy a jasných výsledků.
Ei Sheng Hong
Ei Sheng Hong
Vedoucí návrhu mostů – SMEC, KTP and Surbana Jurong Group
Malaysia

Before IDEA StatiCa, the team had to make many assumptions and simplifications in their designs to capture the structural behavior. So, IDEA StatiCa Detail was exactly the software they needed to overcome these limitations. 

They were also impressed by the software's ability to perform simple analyses, offering the flexibility to extract necessary results and present them in a tabular format. This included various checks such as fatigue analysis. 

Furthermore, because they only needed to model everything once, it saved time. With just a click, the results were displayed. The robust design checks they produced eliminated the need for additional questions or explanations.

Pokud bych použil jiný software, musel bych ho spustit třikrát, protože obsahuje různé komponenty. IDEA StatiCa je pěkná, propracovaná a vše je komplexní.
Ei Sheng Hong
Ei Sheng Hong
Vedoucí návrhu mostů – SMEC, KTP and Surbana Jurong Group
Malaysia

About SMEC

For more than 70 years, SMEC has built a reputation as a trusted partner on major transport and energy infrastructure projects around the world. Our design leaders and specialist teams draw on deep expertise and experience delivering projects across a range of diverse environments, from some of the world’s most remote locations to some of the densest urban surroundings.

Vyzkoušejte IDEA StatiCa zdarma

Zahajte zkušební verzi ještě dnes a užijte si 14 dní plného přístupu zdarma.

OTHER CASE STUDIES

Obloukový železniční most, Jetetice

Střešní konstrukce stadionu AFAS

Multifunkční budova Halle des Saveurs v Paříži

Nosná konstrukce pro podporu fasády

SMEC, KTP and Surbana Jurong Group

SMEC, KTP and Surbana Jurong Group

Malaysia
Již více než 70 let si společnost SMEC buduje pověst důvěryhodného partnera při realizaci významných projektů dopravní a energetické infrastruktury po celém světě. Naši vedoucí projektanti a specializované týmy čerpají z hlubokých odborných znalostí a zkušeností s realizací projektů v nejrůznějších prostředích, od nejodlehlejších míst na světě až po nejhustší městská prostředí. Detail